#6 Marconi Court Level 3 vending machine persistently out of Dr Pepper G. Naismith (Facilities) facilities P4 Facilities / Vending (Chelmsford)
#17 New Starter Induction pack — Silverlight org chart no longer loads S. Pardoe (People & Places) hr-admin P4 HR / Induction
#27 Herring gull nesting in the car-park barrier mechanism; barrier stuck up Site Security — Shoeburyness facilities P4 Facilities / Grounds (Shoeburyness)
#32 Phantom node in Telensa CMS (ghost RID shadowing GAT-4471) S. Rao (Node Control) fault P4 CMS / Telensa
#43 Building 8 cell 3 chiller short-cycling during long-dwell trials Facilities — Shoeburyness facilities P4 Facilities / Cooling (Building 8)
#60 Legacy dev console still showing GAT-4471 as live; is this box still in use? unassigned fault P4 Estate / Inventory
#5 SQL Server deadlocks on the CMS database during the nightly KPI roll-up M. Ross (Infrastructure) fault P3 Infrastructure / Database
#11 Renew the LDAPS certificate on DEVCON-DC01 before it expires M. Ross (Infrastructure) fault P3 Infrastructure / PKI
#31 Wrong cabling in the Building 8 extension — not Cat5e; rip out and reinstall M. Ross (Infrastructure) facilities P3 Facilities / Cabling (Building 8)
#33 450V capacitor banks across Wave-1 columns approaching end-of-life K. Wren (Comms Tech) fault P3 Power / Capacitors
#41 Intermittent 868MHz harmonic near Jesmond Dene (NCL sector) Node Control fault P3 RF / Interference
#42 LeafNut firmware watchdog reset loop after an OTA rollback S. Rao (Node Control) fault P3 Node Controller / Firmware
#44 Inter-site A13 shuttle minibus broke down; morning run to Shoeburyness missed G. Naismith (Facilities) facilities P3 Facilities / Transport
#46 Gateshead satellite (Room 3.14) freezing — Council heating off out of hours S. Charlton (Gateshead) facilities P3 Facilities / Gateshead
#48 ICNIRP thermal-only compliance flag stuck AMBER on 14 columns Regulatory Alignment fault P3 Compliance / Regulatory
#2 GATSO housing replacement — swap 40 legacy units across the GAT sector S. Rao (Node Control) fault P2 Field / Rollout
#4 Scheduled outage: migrate the last Windows 2000 box to Server 2008 R2 M. Ross (Infrastructure) fault P2 Infrastructure / Servers
#8 Backup tape verify failing; RAID array degraded on the CMS host M. Ross (Infrastructure) fault P2 Infrastructure / Backup
#9 GAT-4471 intermittent backhaul flap on the 868MHz control channel S. Rao (Node Control) fault P2 Backhaul / Sub-GHz
#21 Intermittent LDAP auth failures traced to stale DC-locator SRV records D. Pike (Node Control) fault P2 DNS / Directory
#22 Mesh partition across the E11 sector after densification wave; split-brain CMS S. Rao (Node Control) fault P2 Backhaul / Mesh
#23 Telensa CMS intermittently cannot resolve node-registry hostname D. Pike (Node Control) fault P2 DNS / Resolution
#24 IIS worker process recycling under load; escalated to Microsoft support M. Ross (Infrastructure) fault P2 Infrastructure / IIS
#28 WBAN acquisition threshold drift in the GAT sector after booster-cadence change Enrolment fault P2 Enrolment / WBAN
#30 Prepare the Building 8 cell-3 test-bed for the SICORE II prototype install Payload Engineering fault P2 Building 8 / Test-bed
#35 PPS/GPS time drift causing dwell-window desync on densified corridors Node Control fault P2 Time Sync
#37 Separate the airlock interlock from the cell-3 actuation interlock (shared PLC) Payload Engineering facilities P2 Facilities / Building 8 (Safety)
#39 Water leak over the Marconi Court 2nd-floor administration area G. Naismith (Facilities) facilities P2 Facilities / Building (Chelmsford)
#40 Marconi Court Level 3 comms-room air-conditioning failed; temperature climbing G. Naismith (Facilities) facilities P2 Facilities / HVAC (Chelmsford)
#49 Appetite and Sleep channels transposed in build 2.3 — Gateshead cohort flagged 'hungry at 3am' M. Ross (Infrastructure) fault P2 SOMA / Somatic Channels
#52 Thermal yield double-counted in the SOMA coverage return — Finance querying M. Ross (Infrastructure) fault P2 SOMA / Yield Reconciliation
#36 Building 8 airlock stuck mid-cycle — two engineers trapped ~15 minutes Site Security — Shoeburyness facilities P1 Facilities / Building 8 (Safety)
#56 Legacy estate not on the corporate Microsoft site licence; AD subscription expires June 2016 M. Ross (Infrastructure) fault P1 Infrastructure / Licensing
#15 Remove Harvard/LeafNut controllers from six Gateshead columns (Council request) K. Charlton (Gateshead Support) fault P0 Field / Gateshead