| #6 |
Marconi Court Level 3 vending machine persistently out of Dr Pepper
|
G. Naismith (Facilities)
|
facilities
|
P4
|
|
Facilities / Vending (Chelmsford)
|
| #17 |
New Starter Induction pack — Silverlight org chart no longer loads
|
S. Pardoe (People & Places)
|
hr-admin
|
P4
|
|
HR / Induction
|
| #27 |
Herring gull nesting in the car-park barrier mechanism; barrier stuck up
|
Site Security — Shoeburyness
|
facilities
|
P4
|
|
Facilities / Grounds (Shoeburyness)
|
| #32 |
Phantom node in Telensa CMS (ghost RID shadowing GAT-4471)
|
S. Rao (Node Control)
|
fault
|
P4
|
|
CMS / Telensa
|
| #43 |
Building 8 cell 3 chiller short-cycling during long-dwell trials
|
Facilities — Shoeburyness
|
facilities
|
P4
|
|
Facilities / Cooling (Building 8)
|
| #60 |
Legacy dev console still showing GAT-4471 as live; is this box still in use?
|
unassigned
|
fault
|
P4
|
|
Estate / Inventory
|
| #5 |
SQL Server deadlocks on the CMS database during the nightly KPI roll-up
|
M. Ross (Infrastructure)
|
fault
|
P3
|
|
Infrastructure / Database
|
| #11 |
Renew the LDAPS certificate on DEVCON-DC01 before it expires
|
M. Ross (Infrastructure)
|
fault
|
P3
|
|
Infrastructure / PKI
|
| #31 |
Wrong cabling in the Building 8 extension — not Cat5e; rip out and reinstall
|
M. Ross (Infrastructure)
|
facilities
|
P3
|
|
Facilities / Cabling (Building 8)
|
| #33 |
450V capacitor banks across Wave-1 columns approaching end-of-life
|
K. Wren (Comms Tech)
|
fault
|
P3
|
|
Power / Capacitors
|
| #41 |
Intermittent 868MHz harmonic near Jesmond Dene (NCL sector)
|
Node Control
|
fault
|
P3
|
|
RF / Interference
|
| #42 |
LeafNut firmware watchdog reset loop after an OTA rollback
|
S. Rao (Node Control)
|
fault
|
P3
|
|
Node Controller / Firmware
|
| #44 |
Inter-site A13 shuttle minibus broke down; morning run to Shoeburyness missed
|
G. Naismith (Facilities)
|
facilities
|
P3
|
|
Facilities / Transport
|
| #46 |
Gateshead satellite (Room 3.14) freezing — Council heating off out of hours
|
S. Charlton (Gateshead)
|
facilities
|
P3
|
|
Facilities / Gateshead
|
| #48 |
ICNIRP thermal-only compliance flag stuck AMBER on 14 columns
|
Regulatory Alignment
|
fault
|
P3
|
|
Compliance / Regulatory
|
| #2 |
GATSO housing replacement — swap 40 legacy units across the GAT sector
|
S. Rao (Node Control)
|
fault
|
P2
|
|
Field / Rollout
|
| #4 |
Scheduled outage: migrate the last Windows 2000 box to Server 2008 R2
|
M. Ross (Infrastructure)
|
fault
|
P2
|
|
Infrastructure / Servers
|
| #8 |
Backup tape verify failing; RAID array degraded on the CMS host
|
M. Ross (Infrastructure)
|
fault
|
P2
|
|
Infrastructure / Backup
|
| #9 |
GAT-4471 intermittent backhaul flap on the 868MHz control channel
|
S. Rao (Node Control)
|
fault
|
P2
|
|
Backhaul / Sub-GHz
|
| #21 |
Intermittent LDAP auth failures traced to stale DC-locator SRV records
|
D. Pike (Node Control)
|
fault
|
P2
|
|
DNS / Directory
|
| #22 |
Mesh partition across the E11 sector after densification wave; split-brain CMS
|
S. Rao (Node Control)
|
fault
|
P2
|
|
Backhaul / Mesh
|
| #23 |
Telensa CMS intermittently cannot resolve node-registry hostname
|
D. Pike (Node Control)
|
fault
|
P2
|
|
DNS / Resolution
|
| #24 |
IIS worker process recycling under load; escalated to Microsoft support
|
M. Ross (Infrastructure)
|
fault
|
P2
|
|
Infrastructure / IIS
|
| #28 |
WBAN acquisition threshold drift in the GAT sector after booster-cadence change
|
Enrolment
|
fault
|
P2
|
|
Enrolment / WBAN
|
| #30 |
Prepare the Building 8 cell-3 test-bed for the SICORE II prototype install
|
Payload Engineering
|
fault
|
P2
|
|
Building 8 / Test-bed
|
| #35 |
PPS/GPS time drift causing dwell-window desync on densified corridors
|
Node Control
|
fault
|
P2
|
|
Time Sync
|
| #37 |
Separate the airlock interlock from the cell-3 actuation interlock (shared PLC)
|
Payload Engineering
|
facilities
|
P2
|
|
Facilities / Building 8 (Safety)
|
| #39 |
Water leak over the Marconi Court 2nd-floor administration area
|
G. Naismith (Facilities)
|
facilities
|
P2
|
|
Facilities / Building (Chelmsford)
|
| #40 |
Marconi Court Level 3 comms-room air-conditioning failed; temperature climbing
|
G. Naismith (Facilities)
|
facilities
|
P2
|
|
Facilities / HVAC (Chelmsford)
|
| #49 |
Appetite and Sleep channels transposed in build 2.3 — Gateshead cohort flagged 'hungry at 3am'
|
M. Ross (Infrastructure)
|
fault
|
P2
|
|
SOMA / Somatic Channels
|
| #52 |
Thermal yield double-counted in the SOMA coverage return — Finance querying
|
M. Ross (Infrastructure)
|
fault
|
P2
|
|
SOMA / Yield Reconciliation
|
| #36 |
Building 8 airlock stuck mid-cycle — two engineers trapped ~15 minutes
|
Site Security — Shoeburyness
|
facilities
|
P1
|
|
Facilities / Building 8 (Safety)
|
| #56 |
Legacy estate not on the corporate Microsoft site licence; AD subscription expires June 2016
|
M. Ross (Infrastructure)
|
fault
|
P1
|
|
Infrastructure / Licensing
|
| #15 |
Remove Harvard/LeafNut controllers from six Gateshead columns (Council request)
|
K. Charlton (Gateshead Support)
|
fault
|
P0
|
|
Field / Gateshead
|