Modify ↓
Opened 13 years ago
Last modified 13 years ago
#39 RESOLVED facilities
Water leak over the Marconi Court 2nd-floor administration area
| Reported by: | People & Places | Owned by: | G. Naismith (Facilities) |
|---|---|---|---|
| Priority: | P2 | Milestone: | |
| Component: | Facilities / Building (Chelmsford) | Version: | |
| Keywords: | Cc: | ||
| Desk: | Facilities | Legacy ref: | DEVCON-1533 |
Description
Water ingress through the Level 2 suspended ceiling above the administration and Regulatory desks. Two ceiling tiles down, buckets deployed, desks and a printer relocated. Source: Level 3 chilled-water riser or the flat-roof outlet.
Attachments (0)
Change History (2)
comment:1 by , 13 years ago
comment:2 by , 13 years ago
Weeping joint on the Level 3 chilled-water riser, not the roof. Plumber's replaced the section, ceiling tiles back, carpet dried out. Priya's desk survived. Closing.
Note:
See TracTickets
for help on using tickets.
Buckets out, admin moved to the far end. Priya's desk took most of it — thankfully she's on leave and it was only the desk, not her.