DEGRADED MODE — CACHED ENTITLEMENTS · SENTRIS-DB01 UNREACHABLE · People & Places duty desk
Modify

Opened 13 years ago

Last modified 13 years ago

#30 RESOLVED fault

Prepare the Building 8 cell-3 test-bed for the SICORE II prototype install

Reported by: People & Places Owned by: Payload Engineering
Priority: P2 Milestone:
Component: Building 8 / Test-bed Version:
Keywords: Cc:
Desk: Estate & Systems Legacy ref: DEVCON-1320

Description

Stand up the Building 8 cell-3 test-bed for the incoming SICORE II prototype: uprated power feed, revised instrumentation harness, the new beam-dump, and the extension bay for the support racks. This is the next-generation payload and there's a lot riding on it — the client's very keen and so are we.

Attachments (0)

Change History (3)

comment:1 by Payload Engineering, 13 years ago

Big one. SICORE II is a generational step up and cell 3 needs a fair bit of work to host the prototype safely. Scoped: power, harness, beam-dump, and the extension bay (raised separately for the cabling).

comment:2 by K. Wren, 13 years ago

Power feed and beam-dump in and signed off. Harness re-run. Only snag was the extension cabling (see DEVCON-1333) — now sorted.

comment:3 by Payload Engineering, 13 years ago

Test-bed commissioned and validated against the acceptance profile. Ready for the SICORE II prototype when it lands. Genuinely proud of this. Closing.

Modify Ticket

Change Properties
Set your email in Preferences
Action
as RESOLVED The owner will remain Payload Engineering.

Add Comment


E-mail address and name can be saved in the Preferences .
 
Note: See TracTickets for help on using tickets.