Prepare the Building 8 cell-3 test-bed for the SICORE II prototype install
| Reported by: | People & Places | Owned by: | Payload Engineering |
|---|---|---|---|
| Priority: | P2 | Milestone: | |
| Component: | Building 8 / Test-bed | Version: | |
| Keywords: | Cc: | ||
| Desk: | Estate & Systems | Legacy ref: | DEVCON-1320 |
Description
Stand up the Building 8 cell-3 test-bed for the incoming SICORE II prototype: uprated power feed, revised instrumentation harness, the new beam-dump, and the extension bay for the support racks. This is the next-generation payload and there's a lot riding on it — the client's very keen and so are we.
Attachments (0)
Change History (3)
comment:1 by , 13 years ago
comment:2 by , 13 years ago
Power feed and beam-dump in and signed off. Harness re-run. Only snag was the extension cabling (see DEVCON-1333) — now sorted.
comment:3 by , 13 years ago
Test-bed commissioned and validated against the acceptance profile. Ready for the SICORE II prototype when it lands. Genuinely proud of this. Closing.
Big one. SICORE II is a generational step up and cell 3 needs a fair bit of work to host the prototype safely. Scoped: power, harness, beam-dump, and the extension bay (raised separately for the cabling).