Timeline



09/27/13:

00:33 Ticket #30 (Prepare the Building 8 cell-3 test-bed for the SICORE II prototype install) updated by Payload Engineering
Test-bed commissioned and validated against the acceptance profile. …
00:22 Tickets #18,​40 batch updated by S. Rao
Agreed — if that room hits shutdown, every corridor loses its schedule …
00:11 Ticket #40 (Marconi Court Level 3 comms-room air-conditioning failed; temperature ...) updated by G. Naismith
Compressor gone. Two portables not keeping up, room at 31°C. This …
00:00 Ticket #40 (Marconi Court Level 3 comms-room air-conditioning failed; temperature ...) created by People & Places
The dedicated A/C unit for the Level 3 comms room (which houses the …

09/24/13:

00:11 Ticket #39 (Water leak over the Marconi Court 2nd-floor administration area) updated by G. Naismith
Buckets out, admin moved to the far end. Priya's desk took most of it …
00:00 Ticket #39 (Water leak over the Marconi Court 2nd-floor administration area) created by People & Places
Water ingress through the Level 2 suspended ceiling above the …

09/23/13:

00:22 Ticket #38 (One error path leaks the real reverse-proxy build in the Server header) updated by Comms Tech
No. The presentation contract is deliberate and out of scope. Do NOT …

09/20/13:

00:11 Ticket #38 (One error path leaks the real reverse-proxy build in the Server header) updated by D. Pike
Should we not just... fix the header?
00:00 Ticket #38 (One error path leaks the real reverse-proxy build in the Server header) created by People & Places
On a specific 5xx path the edge omits the header override and leaks …

09/06/13:

00:11 Ticket #37 (Separate the airlock interlock from the cell-3 actuation interlock ...) updated by K. Wren
Non-negotiable. A trapped person and an armed cell must not depend on …
00:00 Ticket #37 (Separate the airlock interlock from the cell-3 actuation interlock ...) created by People & Places
Follow-on from DEVCON-1466: the personnel airlock and the cell-3 …

09/05/13:

00:22 Ticket #36 (Building 8 airlock stuck mid-cycle — two engineers trapped ~15 minutes) updated by K. Wren
Watchdog hung on a stuck I/O card. Card swapped, fail-safe vent …
00:11 Ticket #36 (Building 8 airlock stuck mid-cycle — two engineers trapped ~15 minutes) updated by Site Security — Shoeburyness
Both doors latched, cycle hung, two lads sealed in. Barry got them out …
00:00 Ticket #36 (Building 8 airlock stuck mid-cycle — two engineers trapped ~15 minutes) created by People & Places
The Building 8 personnel airlock stalled mid-cycle with both interlock …

09/02/13:

00:22 Ticket #33 (450V capacitor banks across Wave-1 columns approaching end-of-life) updated by Programme Delivery
Ken's earned the benefit of the doubt on this. Funding a phased …
00:11 Ticket #35 (PPS/GPS time drift causing dwell-window desync on densified corridors) updated by D. Pike
Not DNS. I checked. Learning.
00:00 Ticket #35 (PPS/GPS time drift causing dwell-window desync on densified corridors) created by People & Places
On the densest corridors the per-node PPS discipline loses lock and …
Note: See TracTimeline for information about the timeline view.