Timeline
02/14/14:
- 00:22 Ticket #48 (ICNIRP thermal-only compliance flag stuck AMBER on 14 columns) updated by
- Vendor patched the attribute refresh; all 14 flags back to GREEN, …
- 00:11 Ticket #49 (Appetite and Sleep channels transposed in build 2.3 — Gateshead cohort ...) updated by
- Two channel indices are transposed in the 2.3 schedule table. Appetite …
- 00:00 Ticket #49 (Appetite and Sleep channels transposed in build 2.3 — Gateshead cohort ...) created by
- Build 2.3 shipped with two column indices swapped in the …
- 00:00 Ticket #50 (Recruitment — Gateshead Satellite / Monitoring: T. Ashby) created by
- == Curriculum Vitae — Trevor Ashby == Date of birth: 11 May …
01/20/14:
- 00:11 Ticket #48 (ICNIRP thermal-only compliance flag stuck AMBER on 14 columns) updated by
- Attribute-plumbing fault, not an exposure event. (Any genuine …
- 00:00 Ticket #48 (ICNIRP thermal-only compliance flag stuck AMBER on 14 columns) created by
- Fourteen columns reported their ICNIRP 'thermal-only' compliance flag …
01/16/14:
- 00:22 Ticket #43 (Building 8 cell 3 chiller short-cycling during long-dwell trials) updated by
- Uprated the chiller as part of the SICORE II test-bed works …
Note:
See TracTimeline
for information about the timeline view.