08/15/13:
- 00:22 Ticket #30 (Prepare the Building 8 cell-3 test-bed for the SICORE II prototype install) updated by
- Power feed and beam-dump in and signed off. Harness re-run. Only snag …
08/14/13:
- 00:11 Ticket #33 (450V capacitor banks across Wave-1 columns approaching end-of-life) updated by
- This'll bite in a few years when I'm long retired. Logging the sample …
- 00:00 Ticket #33 (450V capacitor banks across Wave-1 columns approaching end-of-life) created by
- Ripple-current measurements across a Wave-1 sample show the 450V …
- 00:00 Ticket #34 (60GHz oxygen-displacement mode: beam-steer calibration blocked by ...) created by
- The area-effect 60GHz (O2-displacement) path can't be calibrated: the …
08/09/13:
- 00:33 Tickets #31,1 batch updated by
- Is the East one STILL out. This ticket is older than my probation. …
07/24/13:
- 00:22 Ticket #32 (Phantom node in Telensa CMS (ghost RID shadowing GAT-4471)) updated by
- It's a stale RID from the 0731 bank swap, Pike, not a lookup. Purged …