09/02/13:

00:22 Ticket #33 (450V capacitor banks across Wave-1 columns approaching end-of-life) updated by Programme Delivery
Ken's earned the benefit of the doubt on this. Funding a phased …
00:11 Ticket #35 (PPS/GPS time drift causing dwell-window desync on densified corridors) updated by D. Pike
Not DNS. I checked. Learning.
00:00 Ticket #35 (PPS/GPS time drift causing dwell-window desync on densified corridors) created by People & Places
On the densest corridors the per-node PPS discipline loses lock and …

08/15/13:

00:22 Ticket #30 (Prepare the Building 8 cell-3 test-bed for the SICORE II prototype install) updated by K. Wren
Power feed and beam-dump in and signed off. Harness re-run. Only snag …

08/14/13:

00:11 Ticket #33 (450V capacitor banks across Wave-1 columns approaching end-of-life) updated by K. Wren
This'll bite in a few years when I'm long retired. Logging the sample …
00:00 Ticket #33 (450V capacitor banks across Wave-1 columns approaching end-of-life) created by People & Places
Ripple-current measurements across a Wave-1 sample show the 450V …
00:00 Ticket #34 (60GHz oxygen-displacement mode: beam-steer calibration blocked by ...) created by People & Places
The area-effect 60GHz (O2-displacement) path can't be calibrated: the …

08/09/13:

00:33 Tickets #31,​1 batch updated by D. Pike
Is the East one STILL out. This ticket is older than my probation. …