Timeline
07/01/13:
- 00:11 Ticket #29 (BSK-0007 medusa payload returns non-nominal on self-test — DO NOT COMMAND) updated by
- Do not command BSK-0007 or BSK-0013 until cleared. Self-test 0x1A is …
06/28/13:
- 00:22 Ticket #28 (WBAN acquisition threshold drift in the GAT sector after ...) updated by
- Channel confirmed a low-yield adjuvant batch. Cadence corrected and …
- 00:00 Ticket #29 (BSK-0007 medusa payload returns non-nominal on self-test — DO NOT COMMAND) created by
- SCORPION STARE unit BSK-0007 (Trafalgar Square, basilisk-class) …
06/03/13:
- 00:33 Ticket #26 (NCL-2001 thermal derate flapping under load (Tyne Bridge gantry)) updated by
- 48h on the analyser, no repro, thermistor in tolerance. Closing …
06/02/13:
- 00:11 Ticket #28 (WBAN acquisition threshold drift in the GAT sector after ...) updated by
- Conductivity histograms are bimodal — one mode below threshold. …
Note:
See TracTimeline
for information about the timeline view.