Timeline
12/05/12:
- 00:33 Ticket #9 (GAT-4471 intermittent backhaul flap on the 868MHz control channel) updated by
- Capacitor-bank sag on 4478's 450V rail pulling the oscillator …
11/06/12:
- 00:22 Ticket #8 (Backup tape verify failing; RAID array degraded on the CMS host) updated by
- New disk in, array rebuilt overnight, tape verify green. We now …
11/05/12:
- 00:22 Ticket #9 (GAT-4471 intermittent backhaul flap on the 868MHz control channel) updated by
- It's a sub-GHz flap, Pike, not a lookup. Harmonic traces back to …
Note:
See TracTimeline
for information about the timeline view.