﻿id	Summary	Status	Owner	Type	Milestone	Priority
5	SQL Server deadlocks on the CMS database during the nightly KPI roll-up	RESOLVED	M. Ross (Infrastructure)	fault		P3
11	Renew the LDAPS certificate on DEVCON-DC01 before it expires	RESOLVED	M. Ross (Infrastructure)	fault		P3
12	Clearance renewal backlog — three colleagues lapsing before reissue	ON HOLD	S. Pardoe (People & Places)	hr-admin		P3
16	Probation reviews overdue for two starters (Intake '13)	OPEN	J. Fairhead (People & Places)	hr-admin		P3
19	Refer-a-friend bounty claims awaiting probation sign-off	DEFERRED	People & Places duty desk	hr-admin		P3
26	NCL-2001 thermal derate flapping under load (Tyne Bridge gantry)	CANNOTREPRODUCE	Node Control	fault		P3
31	Wrong cabling in the Building 8 extension — not Cat5e; rip out and reinstall	RESOLVED	M. Ross (Infrastructure)	facilities		P3
33	450V capacitor banks across Wave-1 columns approaching end-of-life	RESOLVED	K. Wren (Comms Tech)	fault		P3
41	Intermittent 868MHz harmonic near Jesmond Dene (NCL sector)	RESOLVED	Node Control	fault		P3
42	LeafNut firmware watchdog reset loop after an OTA rollback	RESOLVED	S. Rao (Node Control)	fault		P3
44	Inter-site A13 shuttle minibus broke down; morning run to Shoeburyness missed	RESOLVED	G. Naismith (Facilities)	facilities		P3
46	Gateshead satellite (Room 3.14) freezing — Council heating off out of hours	RESOLVED	S. Charlton (Gateshead)	facilities		P3
48	ICNIRP thermal-only compliance flag stuck AMBER on 14 columns	RESOLVED	Regulatory Alignment	fault		P3
51	Endpoint BA-11C7-4F still handshaking three weeks after deprovision	ON HOLD	S. Rao (Node Control)	fault		P3
57	Reminder to future self: extend the Microsoft subscription or shut down this site by June 2026	DEFERRED	unassigned	fault		P3
62	Oldest engagement record won't import — pre-digital folio format has no template mapping	DEFERRED	unassigned	fault		P3
