﻿id	Summary	Status	Owner	Type	Priority	Milestone
36	Building 8 airlock stuck mid-cycle — two engineers trapped ~15 minutes	RESOLVED	Site Security — Shoeburyness	facilities	P1	
37	Separate the airlock interlock from the cell-3 actuation interlock (shared PLC)	RESOLVED	Payload Engineering	facilities	P2	
39	Water leak over the Marconi Court 2nd-floor administration area	RESOLVED	G. Naismith (Facilities)	facilities	P2	
40	Marconi Court Level 3 comms-room air-conditioning failed; temperature climbing	RESOLVED	G. Naismith (Facilities)	facilities	P2	
31	Wrong cabling in the Building 8 extension — not Cat5e; rip out and reinstall	RESOLVED	M. Ross (Infrastructure)	facilities	P3	
44	Inter-site A13 shuttle minibus broke down; morning run to Shoeburyness missed	RESOLVED	G. Naismith (Facilities)	facilities	P3	
46	Gateshead satellite (Room 3.14) freezing — Council heating off out of hours	RESOLVED	S. Charlton (Gateshead)	facilities	P3	
1	Marconi Court East service elevator (Core 4) out of service (landlord matter)	DEFERRED	G. Naismith (Facilities)	facilities	P4	
6	Marconi Court Level 3 vending machine persistently out of Dr Pepper	RESOLVED	G. Naismith (Facilities)	facilities	P4	
27	Herring gull nesting in the car-park barrier mechanism; barrier stuck up	RESOLVED	Site Security — Shoeburyness	facilities	P4	
43	Building 8 cell 3 chiller short-cycling during long-dwell trials	RESOLVED	Facilities — Shoeburyness	facilities	P4	
